Triple

T23258005
Position Surface form Disambiguated ID Type / Status
Subject Internet in Sierra Leone E581923 entity
Predicate infrastructureChallenges P112493 FINISHED
Object limited national fiber coverage LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: limited national fiber coverage | Statement: [Internet in Sierra Leone, infrastructureChallenges, limited national fiber coverage]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: infrastructureChallenges
Context triple: [Internet in Sierra Leone, infrastructureChallenges, limited national fiber coverage]
  • A. infrastructureImpact
    Indicates the effect that an action, event, or entity has on the condition, performance, or availability of infrastructure systems.
  • B. infrastructureFocusArea chosen
    Indicates the specific aspect or domain of infrastructure that an entity, project, or activity is primarily concerned with or directed toward.
  • C. infrastructureNeed
    Indicates that an entity requires the development, improvement, or provision of infrastructure to meet its functional or operational needs.
  • D. infrastructureProjects
    Indicates that there are planned, ongoing, or completed construction or development works related to physical or organizational infrastructure involving the associated entities.
  • E. proposedInfrastructure
    Indicates that an infrastructure project or facility has been suggested or planned but not yet approved, built, or implemented between the related entities.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e246079f58819085eaa9c260906880 completed April 17, 2026, 2:39 p.m.
NER Named-entity recognition batch_69f194c710c48190aff03d210642a043 completed April 29, 2026, 5:19 a.m.
PD Predicate disambiguation batch_69effce4d704819092826931d430e8c4 completed April 28, 2026, 12:18 a.m.
Created at: April 17, 2026, 4:11 p.m.