Triple

T23252026
Position Surface form Disambiguated ID Type / Status
Subject Nkpor E581756 entity
Predicate hasTransportLink P1298 FINISHED
Object Onitsha–Awka road NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Onitsha–Awka road | Statement: [Nkpor, hasTransportLink, Onitsha–Awka road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Onitsha–Awka road
Context triple: [Nkpor, hasTransportLink, Onitsha–Awka road]
  • A. Orlu–Onitsha road
    The Orlu–Onitsha road is a key regional highway in southeastern Nigeria that links the town of Orlu with the major commercial city of Onitsha, facilitating trade and daily travel.
  • B. Orlu–Owerri road
    The Orlu–Owerri road is a major roadway in Imo State, Nigeria, linking the commercial town of Orlu with the state capital, Owerri, and serving as a key route for regional trade and daily commuting.
  • C. Enugu–Nsukka road
    The Enugu–Nsukka road is a major highway in southeastern Nigeria that links the city of Enugu with the university town of Nsukka, serving as a key route for regional travel and commerce.
  • D. Enugu–Onitsha Expressway
    The Enugu–Onitsha Expressway is a major highway in southeastern Nigeria that links the cities of Enugu and Onitsha, serving as a key route for regional commerce and travel.
  • E. Port Harcourt–Aba Road
    Port Harcourt–Aba Road is a major highway in southern Nigeria that links the city of Port Harcourt with the commercial hub of Aba, serving as a key route for regional trade and daily commuting.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Onitsha–Awka road
Target entity description: The Onitsha–Awka road is a major highway in Anambra State, Nigeria, connecting the commercial city of Onitsha with the state capital, Awka, and serving as a key regional transport corridor.
  • A. Orlu–Onitsha road
    The Orlu–Onitsha road is a key regional highway in southeastern Nigeria that links the town of Orlu with the major commercial city of Onitsha, facilitating trade and daily travel.
  • B. Orlu–Owerri road
    The Orlu–Owerri road is a major roadway in Imo State, Nigeria, linking the commercial town of Orlu with the state capital, Owerri, and serving as a key route for regional trade and daily commuting.
  • C. Enugu–Nsukka road
    The Enugu–Nsukka road is a major highway in southeastern Nigeria that links the city of Enugu with the university town of Nsukka, serving as a key route for regional travel and commerce.
  • D. Enugu–Onitsha Expressway
    The Enugu–Onitsha Expressway is a major highway in southeastern Nigeria that links the cities of Enugu and Onitsha, serving as a key route for regional commerce and travel.
  • E. Port Harcourt–Aba Road
    Port Harcourt–Aba Road is a major highway in southern Nigeria that links the city of Port Harcourt with the commercial hub of Aba, serving as a key route for regional trade and daily commuting.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24606b17c81908aba1a4911c8a8ba completed April 17, 2026, 2:39 p.m.
NER Named-entity recognition batch_69f193f7249481909424867e9542d35e completed April 29, 2026, 5:15 a.m.
Created at: April 17, 2026, 4:11 p.m.