Triple

T23223611
Position Surface form Disambiguated ID Type / Status
Subject Nova Kakhovka dam bridge E580959 entity
Predicate instanceOf P0 FINISHED
Object strategic infrastructure C3206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: strategic infrastructure
Context triple: [Nova Kakhovka dam bridge, instanceOf, strategic infrastructure]
  • A. infrastructure strategy report
    A comprehensive document that analyzes current infrastructure assets, forecasts future needs, and outlines prioritized investments and policies to guide long-term infrastructure development and management.
  • B. infrastructure chosen
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • C. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • D. government infrastructure pipeline
    A government infrastructure pipeline is a structured, long-term sequence of planned, funded, and prioritized public works projects—such as transportation, utilities, and civic facilities—designed to guide investment, development, and maintenance of essential national or regional infrastructure.
  • E. strategic military route
    A strategic military route is a planned path or corridor used to move troops, equipment, and supplies efficiently while maximizing operational advantage and minimizing vulnerability to enemy action.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e246043c48819089bae72c9a9c306c completed April 17, 2026, 2:39 p.m.
Created at: April 17, 2026, 4:08 p.m.