Triple

T23215635
Position Surface form Disambiguated ID Type / Status
Subject Autopista A-6 E580729 entity
Predicate hasJunctionWith P1018 FINISHED
Object Autovía A-42 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Autovía A-42 | Statement: [Autopista A-6, hasJunctionWith, Autovía A-42]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Autovía A-42
Context triple: [Autopista A-6, hasJunctionWith, Autovía A-42]
  • A. Autovía A-42 chosen
    Autovía A-42 is a major Spanish motorway that connects Madrid with Toledo, serving as an important commuter and regional transport route in central Spain.
  • B. Autovía A-4
    Autovía A-4 is a major Spanish motorway that forms part of the main route connecting Madrid with the southern region of Andalusia, including cities such as Córdoba and Seville.
  • C. Autovía A-40
    Autovía A-40 is a Spanish motorway that serves as an important east–west connector in central Spain, linking various regional routes and major highways.
  • D. Autovía A-45
    Autovía A-45 is a major Spanish motorway in Andalusia that connects the cities of Córdoba and Málaga, serving as a key north–south transport corridor in the region.
  • E. Autovía A-44
    Autovía A-44 is a major Spanish motorway in Andalusia that connects the city of Granada with the Autovía A-4 near Bailén, forming part of an important north–south inland route.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2460389408190be74f41d217799a9 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f191646c548190a3f7150f0c253dc1 completed April 29, 2026, 5:04 a.m.
Created at: April 17, 2026, 4:08 p.m.