Triple

T23172965
Position Surface form Disambiguated ID Type / Status
Subject Victor Diamond Mine E578910 entity
Predicate instanceOf P0 FINISHED
Object diamond mine C47338 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: diamond mine
Context triple: [Victor Diamond Mine, instanceOf, diamond mine]
  • A. gold mine
    A gold mine is a site or operation where gold-bearing ore is extracted from the earth and processed to recover usable gold.
  • B. silver mine
    A silver mine is an industrial site where silver-bearing ore is extracted from the earth, processed, and refined into usable silver.
  • C. gold and silver mine
    A gold and silver mine is an industrial site where ore containing gold and silver is extracted from the earth, processed, and refined into valuable precious metals.
  • D. opal mine
    An opal mine is a specialized mining site where opal-bearing rock or sediment is extracted, processed, and sorted to obtain gem-quality opals for commercial use.
  • E. open-pit diamond mine
    An open-pit diamond mine is a large, terraced surface excavation where overburden and rock are removed in successive benches to expose and extract diamond-bearing ore.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245fd2a388190b814c0dfa15f7148 completed April 17, 2026, 2:38 p.m.
Created at: April 17, 2026, 4:04 p.m.