Triple

T23155437
Position Surface form Disambiguated ID Type / Status
Subject Jim Highsmith E578423 entity
Predicate instanceOf P0 FINISHED
Object Agile Manifesto signatory C22859 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Agile Manifesto signatory
Context triple: [Jim Highsmith, instanceOf, Agile Manifesto signatory]
  • A. agile development advocate chosen
    An agile development advocate is a professional who champions iterative, collaborative, and customer-focused software development practices to improve responsiveness, quality, and team effectiveness.
  • B. W3C participant
    A W3C participant is an individual or organization that takes part in World Wide Web Consortium activities, such as working groups and community groups, to help develop and maintain open web standards.
  • C. IETF leader
    An IETF leader is an individual who guides and coordinates the Internet Engineering Task Force’s collaborative efforts to develop, standardize, and maintain core Internet protocols and best practices.
  • D. open source contributor
    An open source contributor is an individual who voluntarily improves, maintains, or supports publicly available software or documentation by submitting code, reporting issues, reviewing changes, or providing other collaborative input.
  • E. Q Continuum member
    A Q Continuum member is an omnipotent, immortal being from a collective of godlike entities who can manipulate time, space, and reality at will.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245fb8de081908f0eba7b5fd75bc4 completed April 17, 2026, 2:38 p.m.
Created at: April 17, 2026, 4:01 p.m.