Triple

T23155125
Position Surface form Disambiguated ID Type / Status
Subject Scrum E578417 entity
Predicate timeboxOfSprint P40755 FINISHED
Object One month or less LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: One month or less | Statement: [Scrum, timeboxOfSprint, One month or less]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: timeboxOfSprint
Context triple: [Scrum, timeboxOfSprint, One month or less]
  • A. timeToComplete
    Indicates the duration required for an entity or process to be fully completed.
  • B. timeStatus
    Indicates the temporal state or condition of an event or entity relative to a reference time (e.g., past, present, future, ongoing, or scheduled).
  • C. timePeriod
    Indicates the specific span or interval of time during which an event, state, or relationship occurs or is valid.
  • D. spentTimeIn
    Indicates that an entity has spent a certain amount or period of time in a particular place or context.
  • E. intendedDuration chosen
    Indicates the planned or expected length of time for which an action, event, or state is meant to occur or remain in effect.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245fb8de081908f0eba7b5fd75bc4 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f18efca1f081908ff1c34ba25f40c3 completed April 29, 2026, 4:54 a.m.
PD Predicate disambiguation batch_69ef89ff76808190808ee4ad9dea776b completed April 27, 2026, 4:08 p.m.
Created at: April 17, 2026, 4:01 p.m.