Triple

T23149981
Position Surface form Disambiguated ID Type / Status
Subject 丹波市 E578295 entity
Predicate hasNationalRoute P66899 FINISHED
Object Japan National Route 427 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Japan National Route 427 | Statement: [丹波市, hasNationalRoute, Japan National Route 427]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Japan National Route 427
Context triple: [丹波市, hasNationalRoute, Japan National Route 427]
  • A. Japan National Route 429
    Japan National Route 429 is a national highway in Japan that runs through the Kansai region, connecting several cities and rural areas across multiple prefectures.
  • B. Japan National Route 42
    Japan National Route 42 is a major national highway in Japan that runs along the Pacific coast of the Kii Peninsula, connecting Aichi Prefecture with several cities in Mie and Wakayama Prefectures.
  • C. Japan National Route 246
    Japan National Route 246 is a major national highway in Japan that runs through central Tokyo and Kanagawa Prefecture, serving as a key arterial road for commuter and commercial traffic.
  • D. Japan National Route 238
    Japan National Route 238 is a national highway in northern Hokkaido that runs along the Sea of Okhotsk coast, connecting several remote coastal towns near Japan’s northernmost point.
  • E. Japan National Route 466
    Japan National Route 466 is a national highway in Japan that includes the Daisan Keihin Road and connects parts of Kanagawa Prefecture with the Tokyo metropolitan area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Japan National Route 427
Target entity description: Japan National Route 427 is a national highway in Japan that serves as a regional connector route in Hyōgo Prefecture, including access to the city of Tamba.
  • A. Japan National Route 429
    Japan National Route 429 is a national highway in Japan that runs through the Kansai region, connecting several cities and rural areas across multiple prefectures.
  • B. Japan National Route 42
    Japan National Route 42 is a major national highway in Japan that runs along the Pacific coast of the Kii Peninsula, connecting Aichi Prefecture with several cities in Mie and Wakayama Prefectures.
  • C. Japan National Route 246
    Japan National Route 246 is a major national highway in Japan that runs through central Tokyo and Kanagawa Prefecture, serving as a key arterial road for commuter and commercial traffic.
  • D. Japan National Route 238
    Japan National Route 238 is a national highway in northern Hokkaido that runs along the Sea of Okhotsk coast, connecting several remote coastal towns near Japan’s northernmost point.
  • E. Japan National Route 466
    Japan National Route 466 is a national highway in Japan that includes the Daisan Keihin Road and connects parts of Kanagawa Prefecture with the Tokyo metropolitan area.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245fb8de081908f0eba7b5fd75bc4 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f18ed0b76c8190ac61b949d88e9970 completed April 29, 2026, 4:53 a.m.
Created at: April 17, 2026, 4:01 p.m.