Triple

T2314391
Position Surface form Disambiguated ID Type / Status
Subject Second Avenue Subway E51029 entity
Predicate futurePhase P8970 FINISHED
Object Phase 2 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Phase 2 | Statement: [Second Avenue Subway, futurePhase, Phase 2]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: futurePhase
Context triple: [Second Avenue Subway, futurePhase, Phase 2]
  • A. futureEvolution
    Indicates a predicted or potential future development or transformation of one entity into another.
  • B. phase
    Indicates that one entity is in a particular stage, step, or phase within a process, sequence, or lifecycle relative to another reference.
  • C. upgradePhase
    Indicates the stage or step within a process where an entity is being upgraded or transitioned to a more advanced version or state.
  • D. secondPhase chosen
    Indicates that an entity is in, or has progressed to, the second phase or stage of a multi-phase process or sequence.
  • E. laterGoal
    Indicates that one goal occurs or is intended to be achieved after another goal in time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b074b908190ae983dbca7757d88 completed March 4, 2026, 7:41 p.m.
NER Named-entity recognition batch_69abc685f05481909c863b29d1f6bacd completed March 7, 2026, 6:32 a.m.
PD Predicate disambiguation batch_69abc58e88e481908733fdf79d3f8a15 completed March 7, 2026, 6:28 a.m.
Created at: March 4, 2026, 7:49 p.m.