Triple

T23142788
Position Surface form Disambiguated ID Type / Status
Subject Chilean national power system E577503 entity
Predicate governingLaw P125 FINISHED
Object Chilean General Electricity Law NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chilean General Electricity Law | Statement: [Chilean national power system, governingLaw, Chilean General Electricity Law]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Chilean General Electricity Law
Context triple: [Chilean national power system, governingLaw, Chilean General Electricity Law]
  • A. Chilean national power system
    The Chilean national power system is the interconnected electricity grid that generates, transmits, and distributes most of Chile’s electrical energy across the country.
  • B. Superintendency of Electricity and Fuels of Chile
    The Superintendency of Electricity and Fuels of Chile is the national regulatory authority responsible for overseeing, inspecting, and enforcing safety and quality standards in the country’s electricity and fuel sectors.
  • C. National Energy Commission of Chile
    The National Energy Commission of Chile is a government regulatory body responsible for planning, coordinating, and overseeing the country’s energy policies and markets.
  • D. Chilean Ministry of Energy
    The Chilean Ministry of Energy is the government body responsible for designing and implementing Chile’s national energy policy, overseeing electricity, fuels, and renewable energy development.
  • E. Chilean Water Code
    The Chilean Water Code is the principal legal framework that governs water rights and allocation in Chile, treating water as a tradable private property asset and shaping how regions like Petorca manage and access scarce water resources.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Chilean General Electricity Law
Target entity description: The Chilean General Electricity Law is the primary legal framework that regulates Chile’s electricity sector, including generation, transmission, distribution, and market operation.
  • A. Chilean national power system
    The Chilean national power system is the interconnected electricity grid that generates, transmits, and distributes most of Chile’s electrical energy across the country.
  • B. Superintendency of Electricity and Fuels of Chile
    The Superintendency of Electricity and Fuels of Chile is the national regulatory authority responsible for overseeing, inspecting, and enforcing safety and quality standards in the country’s electricity and fuel sectors.
  • C. National Energy Commission of Chile
    The National Energy Commission of Chile is a government regulatory body responsible for planning, coordinating, and overseeing the country’s energy policies and markets.
  • D. Chilean Ministry of Energy
    The Chilean Ministry of Energy is the government body responsible for designing and implementing Chile’s national energy policy, overseeing electricity, fuels, and renewable energy development.
  • E. Chilean Water Code
    The Chilean Water Code is the principal legal framework that governs water rights and allocation in Chile, treating water as a tradable private property asset and shaping how regions like Petorca manage and access scarce water resources.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245f8e6248190ba3d58e068b4dccb completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f18ecb72fc8190a24e8f5756217a36 completed April 29, 2026, 4:53 a.m.
Created at: April 17, 2026, 4 p.m.