Triple
T23142760
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Chilean national power system |
E577503
|
entity |
| Predicate | predecessor |
P97
|
FINISHED |
| Object | Sistema Interconectado Central |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sistema Interconectado Central | Statement: [Chilean national power system, predecessor, Sistema Interconectado Central]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Sistema Interconectado Central Context triple: [Chilean national power system, predecessor, Sistema Interconectado Central]
-
A.
SIC (Sistema Interconectado Central)
chosen
SIC (Sistema Interconectado Central) is Chile’s former main interconnected electric power grid that supplied electricity to the central region of the country, including most of its population and economic activity.
-
B.
Colombian National Interconnected System
The Colombian National Interconnected System is the nationwide electricity grid that integrates Colombia’s power generation, transmission, and distribution infrastructure into a unified network.
-
C.
Argentine National Interconnected System
The Argentine National Interconnected System is the nationwide high-voltage electricity transmission network that links most of Argentina’s power plants with its regional distribution grids.
-
D.
SING (Sistema Interconectado del Norte Grande)
SING (Sistema Interconectado del Norte Grande) is an interconnected electric power grid serving Chile’s northern region, supplying energy primarily to mining and industrial operations in the area.
-
E.
Brazilian National Interconnected System
The Brazilian National Interconnected System is the nationwide electricity grid that links most of Brazil’s power plants and regions into a single, integrated power network.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245f8e6248190ba3d58e068b4dccb |
completed | April 17, 2026, 2:38 p.m. |
| NER | Named-entity recognition | batch_69f18ecb72fc8190a24e8f5756217a36 |
completed | April 29, 2026, 4:53 a.m. |
Created at: April 17, 2026, 4 p.m.