Triple
T23136214
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Teatro Popular de Niterói (project design phase) |
E577329
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | theater building design |
C46032
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: theater building design Context triple: [Teatro Popular de Niterói (project design phase), instanceOf, theater building design]
-
A.
theatre builder
A theatre builder is a professional or entity responsible for designing, constructing, and outfitting performance spaces to meet artistic, technical, and audience needs.
-
B.
theater
A theater is a venue designed for live performances or film screenings, featuring a stage or screen, seating for an audience, and supporting technical and backstage facilities.
-
C.
entertainment architecture studio
chosen
An entertainment architecture studio is a design firm that specializes in creating immersive, experience-driven spaces for venues such as theaters, theme parks, concert halls, and live event environments.
-
D.
group of theatres
A group of theatres is an organized collection of multiple theatre venues, typically managed under a single ownership or brand for coordinated programming, operations, and marketing.
-
E.
stadium design
Stadium design is the conceptual planning and architectural development of sports and event venues that optimize sightlines, crowd flow, safety, acoustics, and fan experience within structural and environmental constraints.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245f8e6248190ba3d58e068b4dccb |
completed | April 17, 2026, 2:38 p.m. |
Created at: April 17, 2026, 4 p.m.