Triple

T23123108
Position Surface form Disambiguated ID Type / Status
Subject Graduate PLUS Loan E576952 entity
Predicate hasLoanLimitType P25545 FINISHED
Object no aggregate limit up to cost of attendance minus other aid LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: no aggregate limit up to cost of attendance minus other aid | Statement: [Graduate PLUS Loan, hasLoanLimitType, no aggregate limit up to cost of attendance minus other aid]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasLoanLimitType
Context triple: [Graduate PLUS Loan, hasLoanLimitType, no aggregate limit up to cost of attendance minus other aid]
  • A. loanLimitType chosen
    Indicates the category or rule that defines how a loan’s maximum allowable amount or terms are limited.
  • B. hasMaximumBalanceLimit
    Indicates that there is an upper bound on the balance that an account or entity is allowed to hold.
  • C. isLimitOf
    Indicates that one quantity, function, or sequence approaches a particular value as its input or index approaches some specified point or condition.
  • D. guaranteeLimitBasis
    Indicates the basis or criteria used to determine the limit of a guarantee in a contractual or financial context.
  • E. hasLimitation
    Indicates that an entity is subject to a constraint, restriction, or boundary that limits its scope, capability, or applicability.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245f6c2e881909a228fdcfeb7c7d3 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f18e517a0481909829a73fdf255d1c completed April 29, 2026, 4:51 a.m.
PD Predicate disambiguation batch_69ef89f020588190b43393e048e7eda3 completed April 27, 2026, 4:08 p.m.
Created at: April 17, 2026, 3:59 p.m.