Triple
T23119761
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rożnów Power Plant |
E576857
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object | Rożnów Dam |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rożnów Dam | Statement: [Rożnów Power Plant, hasDam, Rożnów Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Rożnów Dam Context triple: [Rożnów Power Plant, hasDam, Rożnów Dam]
-
A.
Rożnów Dam
chosen
Rożnów Dam is a hydroelectric and flood-control dam on the Dunajec River in southern Poland, forming the artificial Rożnów Lake.
-
B.
Wrzeszczyn Dam
Wrzeszczyn Dam is a hydroengineering structure on the Bóbr River in southwestern Poland, built to regulate water flow and support flood control and local water management.
-
C.
Włocławek Dam
Włocławek Dam is a major hydroelectric and flood-control dam on the Vistula River in central Poland, notable as one of the country’s largest river engineering structures.
-
D.
Pilchowice Dam
Pilchowice Dam is a historic early 20th-century masonry gravity dam in southwestern Poland, notable for its large reservoir and role in regional flood control and hydroelectric power generation.
-
E.
Niedzica Dam
Niedzica Dam is a large hydroelectric and flood-control dam on the Dunajec River in southern Poland, known for forming the scenic Czorsztyn Lake and serving as a major regional tourist attraction.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245f6c2e881909a228fdcfeb7c7d3 |
completed | April 17, 2026, 2:38 p.m. |
| NER | Named-entity recognition | batch_69f18e4ece5481908d05b4b1e6a07db3 |
completed | April 29, 2026, 4:51 a.m. |
Created at: April 17, 2026, 3:59 p.m.