Triple
T23112788
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lagan Navigation Company |
E576366
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | navigation company |
C47242
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: navigation company Context triple: [Lagan Navigation Company, instanceOf, navigation company]
-
A.
navigation system
A navigation system is a coordinated set of hardware and software components that determines a user's position and provides optimal routes and guidance to reach desired destinations.
-
B.
transportation network company
A transportation network company is a business that uses digital platforms, typically mobile apps, to connect passengers with drivers who provide on-demand transportation services.
-
C.
navigational passage
A navigational passage is a corridor, channel, or route—often within a building, vessel, or geographic area—designed to guide movement safely and efficiently from one location to another.
-
D.
travel company
A travel company is a business that plans, organizes, and sells transportation, accommodation, and related services to individuals or groups for leisure or business trips.
-
E.
navigator
A navigator is an entity responsible for determining and directing the optimal path or course from a starting point to a desired destination using available information and tools.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245f4af548190898d434a64a1e774 |
completed | April 17, 2026, 2:38 p.m. |
Created at: April 17, 2026, 3:58 p.m.