Triple

T23112533
Position Surface form Disambiguated ID Type / Status
Subject Central North Carolina E576358 entity
Predicate traversedBy P225 FINISHED
Object Interstate 85 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 85 | Statement: [Central North Carolina, traversedBy, Interstate 85]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 85
Context triple: [Central North Carolina, traversedBy, Interstate 85]
  • A. Interstate 85 chosen
    Interstate 85 is a major Interstate Highway in the southeastern United States that runs from Alabama to Virginia, serving key cities such as Atlanta, Charlotte, and Durham.
  • B. Interstate 77
    Interstate 77 is a major north–south U.S. highway running from South Carolina through several states, including West Virginia and Ohio, to northeastern Ohio near Lake Erie.
  • C. Interstate 140
    Interstate 140 is a short auxiliary Interstate highway serving the Knoxville, Tennessee area, providing a connector route around the city.
  • D. Interstate 81
    Interstate 81 is a major north–south U.S. highway running primarily through the Appalachian region from Tennessee to the Canadian border in New York, serving as a key freight and travel corridor.
  • E. Interstate 65
    Interstate 65 is a major north–south U.S. highway running through the central United States, connecting the Gulf Coast to the Midwest and serving key cities such as Mobile, Birmingham, Nashville, and Indianapolis.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245f4af548190898d434a64a1e774 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f18e100d408190a7349563235640d5 completed April 29, 2026, 4:50 a.m.
Created at: April 17, 2026, 3:58 p.m.