Triple
T23103709
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mitsubishi Corporation |
E576100
|
entity |
| Predicate | hasDivision |
P35
|
FINISHED |
| Object | Industrial Infrastructure Group |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Industrial Infrastructure Group | Statement: [Mitsubishi Corporation, hasDivision, Industrial Infrastructure Group]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Industrial Infrastructure Group Context triple: [Mitsubishi Corporation, hasDivision, Industrial Infrastructure Group]
-
A.
Estate and Infrastructure Group
The Estate and Infrastructure Group is a division of Australia's Department of Defence responsible for managing and sustaining the Defence estate, facilities, and related infrastructure.
-
B.
Industry Building
The Industry Building is a historic exhibition hall at Toronto’s Exhibition Place, used for trade shows, fairs, and large public events.
-
C.
Engineering & Construction Group
Engineering & Construction Group is the global engineering and construction division of Samsung C&T, responsible for large-scale infrastructure, building, and industrial projects.
-
D.
Office of Infrastructure
The Office of Infrastructure is a division within the Federal Highway Administration responsible for overseeing the planning, design, construction, and preservation of the nation’s highway infrastructure.
-
E.
Social Infrastructure & Industrial Systems
Social Infrastructure & Industrial Systems is a Hitachi business division that develops and provides large-scale infrastructure and industrial solutions such as transportation, energy, and urban systems.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Industrial Infrastructure Group Target entity description: Industrial Infrastructure Group is a Mitsubishi Corporation business division focused on developing, operating, and investing in large-scale industrial and social infrastructure projects worldwide.
-
A.
Estate and Infrastructure Group
The Estate and Infrastructure Group is a division of Australia's Department of Defence responsible for managing and sustaining the Defence estate, facilities, and related infrastructure.
-
B.
Industry Building
The Industry Building is a historic exhibition hall at Toronto’s Exhibition Place, used for trade shows, fairs, and large public events.
-
C.
Engineering & Construction Group
Engineering & Construction Group is the global engineering and construction division of Samsung C&T, responsible for large-scale infrastructure, building, and industrial projects.
-
D.
Office of Infrastructure
The Office of Infrastructure is a division within the Federal Highway Administration responsible for overseeing the planning, design, construction, and preservation of the nation’s highway infrastructure.
-
E.
Social Infrastructure & Industrial Systems
Social Infrastructure & Industrial Systems is a Hitachi business division that develops and provides large-scale infrastructure and industrial solutions such as transportation, energy, and urban systems.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245c060b48190a9bd61a47a16db17 |
completed | April 17, 2026, 2:37 p.m. |
| NER | Named-entity recognition | batch_69f18deaacbc8190a97e64e1cf39cdd6 |
completed | April 29, 2026, 4:49 a.m. |
Created at: April 17, 2026, 3:58 p.m.