Triple

T2310031
Position Surface form Disambiguated ID Type / Status
Subject Bramley-Moore Dock stadium development E51932 entity
Predicate partOf P40 FINISHED
Object Liverpool Waters regeneration scheme
The Liverpool Waters regeneration scheme is a major long-term waterfront redevelopment project in Liverpool, England, transforming former docklands into a mixed-use district of residential, commercial, and leisure spaces.
E252085 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Liverpool Waters regeneration scheme | Statement: [Bramley-Moore Dock stadium development, partOf, Liverpool Waters regeneration scheme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Liverpool Waters regeneration scheme
Context triple: [Bramley-Moore Dock stadium development, partOf, Liverpool Waters regeneration scheme]
  • A. Royal Arsenal Riverside regeneration project
    The Royal Arsenal Riverside regeneration project is a major mixed-use redevelopment transforming the historic Royal Arsenal site in Woolwich into a modern residential, commercial, and cultural riverside district.
  • B. Belfast city centre waterfront regeneration
    Belfast city centre waterfront regeneration is a major urban redevelopment initiative transforming former docklands and industrial waterfront areas into a mixed-use district of housing, business, culture, and tourism.
  • C. Thames Gateway regeneration area
    The Thames Gateway regeneration area is a major urban renewal and development corridor in South East England focused on revitalizing former industrial and brownfield sites along the River Thames.
  • D. HafenCity development area
    The HafenCity development area is a major urban regeneration project in Hamburg, Germany, transforming former port and industrial land into a modern mixed-use waterfront district.
  • E. Western Docklands
    Western Docklands is a waterfront urban area in Amsterdam known for its redeveloped harbor basins, modern residential architecture, and proximity to the IJ Bay.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Liverpool Waters regeneration scheme
Triple: [Bramley-Moore Dock stadium development, partOf, Liverpool Waters regeneration scheme]
Generated description
The Liverpool Waters regeneration scheme is a major long-term waterfront redevelopment project in Liverpool, England, transforming former docklands into a mixed-use district of residential, commercial, and leisure spaces.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Liverpool Waters regeneration scheme
Target entity description: The Liverpool Waters regeneration scheme is a major long-term waterfront redevelopment project in Liverpool, England, transforming former docklands into a mixed-use district of residential, commercial, and leisure spaces.
  • A. Royal Arsenal Riverside regeneration project
    The Royal Arsenal Riverside regeneration project is a major mixed-use redevelopment transforming the historic Royal Arsenal site in Woolwich into a modern residential, commercial, and cultural riverside district.
  • B. Belfast city centre waterfront regeneration
    Belfast city centre waterfront regeneration is a major urban redevelopment initiative transforming former docklands and industrial waterfront areas into a mixed-use district of housing, business, culture, and tourism.
  • C. Thames Gateway regeneration area
    The Thames Gateway regeneration area is a major urban renewal and development corridor in South East England focused on revitalizing former industrial and brownfield sites along the River Thames.
  • D. HafenCity development area
    The HafenCity development area is a major urban regeneration project in Hamburg, Germany, transforming former port and industrial land into a modern mixed-use waterfront district.
  • E. Western Docklands
    Western Docklands is a waterfront urban area in Amsterdam known for its redeveloped harbor basins, modern residential architecture, and proximity to the IJ Bay.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b0bb30c81908ded03b006d29387 completed March 4, 2026, 7:42 p.m.
NER Named-entity recognition batch_69abc6098ce88190ba2e987e6f0737ac completed March 7, 2026, 6:30 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae7f3adc548190bb73d8bba58165fa completed March 9, 2026, 8:05 a.m.
NEDg Description generation batch_69ae7f90d3a88190bf61c6f063b67c06 completed March 9, 2026, 8:06 a.m.
NED2 Entity disambiguation (via description) batch_69ae800868948190a5504969c4cabb7d completed March 9, 2026, 8:08 a.m.
Created at: March 4, 2026, 7:49 p.m.