Triple

T2309194
Position Surface form Disambiguated ID Type / Status
Subject USS Nautilus E51912 entity
Predicate instanceOf P0 FINISHED
Object United States Navy submarine C763 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: United States Navy submarine
Context triple: [USS Nautilus, instanceOf, United States Navy submarine]
  • A. military submarine
    A military submarine is a stealth-capable naval vessel designed to operate underwater for extended periods to conduct surveillance, reconnaissance, and combat missions.
  • B. Balao-class submarine
    The Balao-class submarine was a World War II-era U.S. Navy diesel-electric attack submarine class, an improved version of the Gato class, designed for long-range Pacific operations with enhanced diving depth and endurance.
  • C. United States Navy ship chosen
    A United States Navy ship is a commissioned naval vessel operated by the U.S. Navy, designed, equipped, and crewed to perform military, logistical, and support missions at sea and in littoral environments.
  • D. United States Navy ship class
    A United States Navy ship class is a group of naval vessels sharing a common design, construction specifications, and intended operational role within the U.S. Navy.
  • E. Gleaves-class destroyer
    The Gleaves-class destroyer was a World War II-era United States Navy class of fast, versatile destroyers designed for anti-submarine warfare, convoy escort, and fleet screening operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b0bb30c81908ded03b006d29387 completed March 4, 2026, 7:42 p.m.
Created at: March 4, 2026, 7:49 p.m.