Triple
T23082303
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Indiana State Road 39 |
E575507
|
entity |
| Predicate | hasJunctionWith |
P1018
|
FINISHED |
| Object | Indiana State Road 26 |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Indiana State Road 26 | Statement: [Indiana State Road 39, hasJunctionWith, Indiana State Road 26]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Indiana State Road 26 Context triple: [Indiana State Road 39, hasJunctionWith, Indiana State Road 26]
-
A.
Indiana State Road 264
Indiana State Road 264 is a short state highway in Indiana that serves as a connector route near Santa Claus, linking local traffic to nearby major roads and attractions.
-
B.
Indiana State Road 265
Indiana State Road 265 was a short former state highway in southern Indiana that served as part of the Ohio River Bridges Project, connecting Interstate 65 near Jeffersonville to the Lewis and Clark Bridge over the Ohio River.
-
C.
Indiana State Road 23
Indiana State Road 23 is a north–south state highway in northern Indiana that connects several small towns and rural areas, including Walkerton.
-
D.
Indiana State Road 22
Indiana State Road 22 is an east–west state highway in central Indiana that serves as a key route through Kokomo and connects several communities across the region.
-
E.
Indiana State Road 28
Indiana State Road 28 is an east–west state highway in Indiana that spans much of the state, connecting multiple central and eastern communities.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Indiana State Road 26 Target entity description: Indiana State Road 26 is an east–west state highway in Indiana that runs across the central part of the state, connecting rural areas with cities such as Lafayette.
-
A.
Indiana State Road 264
Indiana State Road 264 is a short state highway in Indiana that serves as a connector route near Santa Claus, linking local traffic to nearby major roads and attractions.
-
B.
Indiana State Road 265
Indiana State Road 265 was a short former state highway in southern Indiana that served as part of the Ohio River Bridges Project, connecting Interstate 65 near Jeffersonville to the Lewis and Clark Bridge over the Ohio River.
-
C.
Indiana State Road 23
Indiana State Road 23 is a north–south state highway in northern Indiana that connects several small towns and rural areas, including Walkerton.
-
D.
Indiana State Road 22
Indiana State Road 22 is an east–west state highway in central Indiana that serves as a key route through Kokomo and connects several communities across the region.
-
E.
Indiana State Road 28
Indiana State Road 28 is an east–west state highway in Indiana that spans much of the state, connecting multiple central and eastern communities.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245be28d48190ad1348d5a73db37d |
completed | April 17, 2026, 2:37 p.m. |
| NER | Named-entity recognition | batch_69f18da239e48190ad041261c6b510a0 |
completed | April 29, 2026, 4:48 a.m. |
Created at: April 17, 2026, 3:56 p.m.