Triple
T23081787
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | TS 28-series |
E575494
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | OAM specification series |
C32662
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: OAM specification series Context triple: [TS 28-series, instanceOf, OAM specification series]
-
A.
Ethernet OAM standard
The Ethernet OAM standard defines protocols and mechanisms for monitoring, fault management, and performance management in Ethernet networks to ensure reliable and maintainable service operation.
-
B.
IEEE 802.21 feature set
The IEEE 802.21 feature set comprises mechanisms and protocols that enable seamless media-independent handover and service continuity across heterogeneous wireless and wired networks.
-
C.
Ethernet fronthaul standard
An Ethernet fronthaul standard defines the protocols, interfaces, and performance requirements for transporting radio access network (RAN) traffic between distributed radio units and centralized baseband units over Ethernet-based networks.
-
D.
Connectivity Fault Management standard
chosen
The Connectivity Fault Management standard defines protocols and mechanisms for detecting, isolating, and managing connectivity faults in Ethernet and packet-based networks to ensure reliable end-to-end service.
-
E.
5G NAS specification
The 5G NAS specification defines the signaling procedures, message formats, and protocols used between user equipment and the 5G core network for functions such as registration, session management, mobility, and security at the non-access stratum layer.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245be28d48190ad1348d5a73db37d |
completed | April 17, 2026, 2:37 p.m. |
Created at: April 17, 2026, 3:56 p.m.