Triple

T23068393
Position Surface form Disambiguated ID Type / Status
Subject Río Limay E575119 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Pichi Picún Leufú Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pichi Picún Leufú Dam | Statement: [Río Limay, hasHydroelectricPlant, Pichi Picún Leufú Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pichi Picún Leufú Dam
Context triple: [Río Limay, hasHydroelectricPlant, Pichi Picún Leufú Dam]
  • A. Pichi Picún Leufú Dam chosen
    Pichi Picún Leufú Dam is a hydroelectric dam in Argentina that forms part of the Limay River’s cascade of power stations, contributing to regional electricity generation and water regulation.
  • B. Jupiá Dam
    Jupiá Dam is a major hydroelectric dam on the Paraná River in Brazil, contributing significantly to the region’s power generation within the broader Paraná River hydroelectric complex.
  • C. Lago Chico
    Lago Chico is a small mountain lake in southern Chile’s Huerquehue National Park, known for its tranquil forested surroundings and scenic hiking access.
  • D. Picún Leufú
    Picún Leufú is a town in the Neuquén Province of Argentina that serves as an administrative and service center for the surrounding rural region.
  • E. Pehuenche Dam
    Pehuenche Dam is a hydroelectric dam on the upper Bío Bío River in Chile, forming part of a cascade of power-generating reservoirs in the Andean foothills.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245bd6e4c8190bb8942245b68cad5 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f189a5aa4081909b3f0dc92877323d completed April 29, 2026, 4:31 a.m.
Created at: April 17, 2026, 3:55 p.m.