Triple

T23045625
Position Surface form Disambiguated ID Type / Status
Subject 류경호텔 E573869 entity
Predicate instanceOf P0 FINISHED
Object 초고층 건물 C36406 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 초고층 건물
Context triple: [류경호텔, instanceOf, 초고층 건물]
  • A. high‑rise building
    A high-rise building is a tall, multi-story structure designed to accommodate residential, commercial, or mixed-use functions, typically requiring vertical transportation systems such as elevators.
  • B. super­tall building chosen
    A supertall building is an exceptionally high skyscraper, typically exceeding 300 meters (984 feet) in height, designed to accommodate mixed uses such as offices, residences, and public spaces within a highly vertical structure.
  • C. megatall skyscraper
    A megatall skyscraper is an exceptionally high-rise building exceeding 600 meters in height, designed to maximize vertical space for mixed-use functions while showcasing advanced engineering and architectural innovation.
  • D. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • E. commercial high-rise
    A commercial high-rise is a tall, multi-story building primarily designed and constructed to house businesses, offices, and other commercial activities within an urban environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b9c11481909d06c872214d21af completed April 17, 2026, 2:37 p.m.
Created at: April 17, 2026, 3:54 p.m.