Triple

T23041805
Position Surface form Disambiguated ID Type / Status
Subject Green Dot Corporation E573756 entity
Predicate tickerSymbol P1447 FINISHED
Object GDOT NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GDOT | Statement: [Green Dot Corporation, tickerSymbol, GDOT]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: GDOT
Context triple: [Green Dot Corporation, tickerSymbol, GDOT]
  • A. Georgia Department of Transportation
    The Georgia Department of Transportation is the state agency responsible for planning, constructing, and maintaining Georgia’s transportation infrastructure, including highways, bridges, and public transit systems.
  • B. South Carolina Department of Transportation
    The South Carolina Department of Transportation is the state agency responsible for planning, building, and maintaining South Carolina’s highway and transportation infrastructure.
  • C. Georgia Regional Transportation Authority
    The Georgia Regional Transportation Authority is a state-level agency that plans and coordinates transportation and air quality initiatives in the Atlanta metropolitan region.
  • D. Georgia Department of Driver Services
    The Georgia Department of Driver Services is the state agency responsible for issuing driver’s licenses and identification cards, overseeing driving tests, and administering related motor vehicle and driver safety services in Georgia.
  • E. Florida Department of Transportation
    The Florida Department of Transportation is the state government agency responsible for planning, building, and maintaining Florida’s transportation infrastructure, including its highways, bridges, and public transit systems.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: GDOT
Target entity description: GDOT is the stock ticker symbol for Green Dot Corporation, a U.S.-based financial technology and bank holding company known for its prepaid debit cards and banking-as-a-service platform.
  • A. Georgia Department of Transportation
    The Georgia Department of Transportation is the state agency responsible for planning, constructing, and maintaining Georgia’s transportation infrastructure, including highways, bridges, and public transit systems.
  • B. South Carolina Department of Transportation
    The South Carolina Department of Transportation is the state agency responsible for planning, building, and maintaining South Carolina’s highway and transportation infrastructure.
  • C. Georgia Regional Transportation Authority
    The Georgia Regional Transportation Authority is a state-level agency that plans and coordinates transportation and air quality initiatives in the Atlanta metropolitan region.
  • D. Georgia Department of Driver Services
    The Georgia Department of Driver Services is the state agency responsible for issuing driver’s licenses and identification cards, overseeing driving tests, and administering related motor vehicle and driver safety services in Georgia.
  • E. Florida Department of Transportation
    The Florida Department of Transportation is the state government agency responsible for planning, building, and maintaining Florida’s transportation infrastructure, including its highways, bridges, and public transit systems.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b9c11481909d06c872214d21af completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f18513fc54819096d761a0be75b774 completed April 29, 2026, 4:12 a.m.
Created at: April 17, 2026, 3:54 p.m.