Triple

T23040057
Position Surface form Disambiguated ID Type / Status
Subject Whirlfire Turbo-Power gas turbine E573708 entity
Predicate massProductionStatus P64427 FINISHED
Object not mass-produced LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: not mass-produced | Statement: [Whirlfire Turbo-Power gas turbine, massProductionStatus, not mass-produced]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: massProductionStatus
Context triple: [Whirlfire Turbo-Power gas turbine, massProductionStatus, not mass-produced]
  • A. hasProductionStatus chosen
    Indicates the current stage or condition of an entity’s production process (e.g., planned, in progress, completed, or discontinued).
  • B. mainProductionState
    Indicates the primary state or region where the production of something (e.g., a product, work, or content) predominantly takes place.
  • C. massProduced
    Indicates that an item is manufactured in large quantities, typically using standardized, industrial production processes.
  • D. hasProduction
    Indicates that an entity is associated with, or responsible for, the creation or manufacture of another entity or product.
  • E. currentProduction
    Indicates that an entity is presently engaged in producing, manufacturing, or generating another entity or output.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b911188190bc3d96326c847969 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f18512df708190a6892e743a289c74 completed April 29, 2026, 4:12 a.m.
PD Predicate disambiguation batch_69ef89d5f71881908b9f9d0c8aab278c completed April 27, 2026, 4:07 p.m.
Created at: April 17, 2026, 3:53 p.m.