Triple

T23035735
Position Surface form Disambiguated ID Type / Status
Subject MRT Line 6 E573588 entity
Predicate plannedOpeningToKamalapur P150736 FINISHED
Object later phase LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: later phase | Statement: [MRT Line 6, plannedOpeningToKamalapur, later phase]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedOpeningToKamalapur
Context triple: [MRT Line 6, plannedOpeningToKamalapur, later phase]
  • A. plannedOpeningDate
    Indicates the date on which something is scheduled or intended to begin operating or become available.
  • B. phase1OpeningDate
    Indicates the date on which the first phase of a project, development, or initiative is officially opened or begins operation.
  • C. templeOpening
    Indicates that a temple begins operating or becomes accessible for worship, visitation, or related activities.
  • D. originalPlannedOpeningYear
    Indicates the year that was initially scheduled or intended for something to open, before any delays or changes.
  • E. openedForTram
    Indicates that something (such as a route, track, or facility) is available and in use for tram operations.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b911188190bc3d96326c847969 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f1850df7fc81909ee522d99d96af0d completed April 29, 2026, 4:11 a.m.
PD Predicate disambiguation batch_69ef3ba004a48190885aece88efd1f52 completed April 27, 2026, 10:34 a.m.
PDg Predicate description generation batch_69ef538b29c081908fa56ee35a1dcee7 completed April 27, 2026, 12:16 p.m.
Created at: April 17, 2026, 3:53 p.m.