Triple

T23034695
Position Surface form Disambiguated ID Type / Status
Subject Ministry of Power, Energy and Mineral Resources of Bangladesh E573560 entity
Predicate coordinatesWith P1140 FINISHED
Object Bangladesh Power Development Board NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bangladesh Power Development Board | Statement: [Ministry of Power, Energy and Mineral Resources of Bangladesh, coordinatesWith, Bangladesh Power Development Board]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bangladesh Power Development Board
Context triple: [Ministry of Power, Energy and Mineral Resources of Bangladesh, coordinatesWith, Bangladesh Power Development Board]
  • A. Bangladesh power grid
    The Bangladesh power grid is the nationwide electricity transmission and distribution network of Bangladesh, which also exchanges power with neighboring countries such as India.
  • B. Bihar State Power Holding Company Limited
    Bihar State Power Holding Company Limited is the state-owned utility responsible for managing electricity generation, transmission, and distribution in the Indian state of Bihar.
  • C. Bangladesh Cable Shilpa Limited
    Bangladesh Cable Shilpa Limited is a state-owned Bangladeshi manufacturer of telecommunication cables and related infrastructure equipment.
  • D. Water and Power Development Authority
    The Water and Power Development Authority (WAPDA) is Pakistan’s federal agency responsible for the development and management of the country’s water and hydropower resources, including major dams and related infrastructure.
  • E. National Hydroelectric Power Corporation
    National Hydroelectric Power Corporation is an Indian government-owned enterprise responsible for developing, operating, and managing hydroelectric power projects across the country.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Bangladesh Power Development Board
Target entity description: The Bangladesh Power Development Board is the state-owned agency responsible for electricity generation, transmission, and distribution across Bangladesh.
  • A. Bangladesh power grid
    The Bangladesh power grid is the nationwide electricity transmission and distribution network of Bangladesh, which also exchanges power with neighboring countries such as India.
  • B. Bihar State Power Holding Company Limited
    Bihar State Power Holding Company Limited is the state-owned utility responsible for managing electricity generation, transmission, and distribution in the Indian state of Bihar.
  • C. Bangladesh Cable Shilpa Limited
    Bangladesh Cable Shilpa Limited is a state-owned Bangladeshi manufacturer of telecommunication cables and related infrastructure equipment.
  • D. Water and Power Development Authority
    The Water and Power Development Authority (WAPDA) is Pakistan’s federal agency responsible for the development and management of the country’s water and hydropower resources, including major dams and related infrastructure.
  • E. National Hydroelectric Power Corporation
    National Hydroelectric Power Corporation is an Indian government-owned enterprise responsible for developing, operating, and managing hydroelectric power projects across the country.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b911188190bc3d96326c847969 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f18483e5848190977b1bdb1b83d187 completed April 29, 2026, 4:09 a.m.
Created at: April 17, 2026, 3:53 p.m.