Triple
T23002894
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Trintelhaven |
E572678
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former work island |
C22840
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former work island Context triple: [Trintelhaven, instanceOf, former work island]
-
A.
former island
A former island is a landform that was once completely surrounded by water but has since become connected to a larger landmass or lost its insular status due to natural or human-induced changes.
-
B.
reclaimed island
chosen
A reclaimed island is an artificial landmass created by filling in bodies of water, such as seas, lakes, or rivers, with earth, sand, or other materials to form usable land for human activities.
-
C.
former pier
A former pier is a structure that once extended from the shore into a body of water for docking, loading, or recreation, but is no longer used or maintained for its original purpose.
-
D.
former port facility
A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
-
E.
shipbuilding facility
A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245b6a3ac81908087599eefe3e365 |
completed | April 17, 2026, 2:37 p.m. |
Created at: April 17, 2026, 3:50 p.m.