Triple

T22999166
Position Surface form Disambiguated ID Type / Status
Subject Leonids E572587 entity
Predicate peakMonth P108895 FINISHED
Object November LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: November | Statement: [Leonids, peakMonth, November]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: peakMonth
Context triple: [Leonids, peakMonth, November]
  • A. peakSeasonMonth chosen
    Indicates the month or months during which something (such as demand, activity, or occurrence) reaches its highest or most intense level.
  • B. typicalMonthOfOccurrence
    Indicates the month in which something most commonly or typically occurs.
  • C. peakDay
    Indicates the specific day on which a quantity, activity, or effect reaches its maximum level within a given period.
  • D. monthObserved
    Indicates the month during which an event, observation, or measurement took place.
  • E. culminationMonth
    Indicates the month in which an event, process, or activity reaches its peak, completion, or final stage.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b6a3ac81908087599eefe3e365 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f182f6484c8190bfe3f7ea894c43d8 completed April 29, 2026, 4:03 a.m.
PD Predicate disambiguation batch_69ef3b974e7c8190b8be11dbb4518693 completed April 27, 2026, 10:33 a.m.
Created at: April 17, 2026, 3:50 p.m.