Triple

T22992253
Position Surface form Disambiguated ID Type / Status
Subject Central Bus Station of Brasília vicinity E572081 entity
Predicate urbanContext P1495 FINISHED
Object Monumental Axis corridor NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Monumental Axis corridor | Statement: [Central Bus Station of Brasília vicinity, urbanContext, Monumental Axis corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Monumental Axis corridor
Context triple: [Central Bus Station of Brasília vicinity, urbanContext, Monumental Axis corridor]
  • A. South Axis corridor
    The South Axis corridor is Amsterdam’s main high-density business district and development zone, characterized by modern offices, mixed-use buildings, and major transport links.
  • B. Monumental Axis bus corridor chosen
    The Monumental Axis bus corridor is a dedicated high-capacity public transport route running along Brasília’s central Monumental Axis, serving as a key spine for urban mobility in Brazil’s capital.
  • C. Decumano axis
    The Decumano axis was the central, kilometer-long main boulevard of Expo 2015 in Milan, along which the majority of national pavilions and exhibition spaces were arranged.
  • D. Monumental Axis
    The Monumental Axis is Brasília’s grand central avenue and ceremonial spine, lined with key government buildings and monuments and serving as the city’s main civic and architectural showcase.
  • E. North–South and East–West Corridor
    The North–South and East–West Corridor is a major Indian highway development project that connects the country’s extremities through long-distance north–south and east–west routes to improve national connectivity and economic integration.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b535808190adef8a9df3c584db completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f182f017a88190b02d0649a3af5d99 completed April 29, 2026, 4:02 a.m.
Created at: April 17, 2026, 3:50 p.m.