Triple

T22953111
Position Surface form Disambiguated ID Type / Status
Subject Cootehill E570075 entity
Predicate hasCoordinateSystem P182 FINISHED
Object Irish grid reference system NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Irish grid reference system | Statement: [Cootehill, hasCoordinateSystem, Irish grid reference system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Irish grid reference system
Context triple: [Cootehill, hasCoordinateSystem, Irish grid reference system]
  • A. Irish grid reference system chosen
    The Irish grid reference system is a national coordinate framework used to map and locate positions across the island of Ireland with standardized alphanumeric grid references.
  • B. Irish Transverse Mercator
    Irish Transverse Mercator is a modern, high-precision map projection and coordinate reference system used for surveying and mapping across Ireland.
  • C. British National Grid
    The British National Grid is the Ordnance Survey’s coordinate reference system used to map and locate positions across Great Britain with high precision.
  • D. Eircode system
    The Eircode system is Ireland’s national postcode system, assigning unique seven-character codes to individual addresses to improve mail delivery and location services.
  • E. Georgian national grid
    The Georgian national grid is the high-voltage electricity transmission network that distributes power across Georgia and connects major generation sources, including large hydropower plants, to consumers and regional systems.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2459199d08190a8184ee2aa935842 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f181a34c30819099ff4812500a0991 completed April 29, 2026, 3:57 a.m.
Created at: April 17, 2026, 3:46 p.m.