Triple

T22922741
Position Surface form Disambiguated ID Type / Status
Subject 木津川市 E568907 entity
Predicate servedByRailwayLine P848 FINISHED
Object JR奈良線 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: JR奈良線 | Statement: [木津川市, servedByRailwayLine, JR奈良線]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: JR奈良線
Context triple: [木津川市, servedByRailwayLine, JR奈良線]
  • A. 紀勢本線
    紀勢本線 is a major railway line in Japan operated by JR Central and JR West that runs along the Kii Peninsula, connecting Mie, Wakayama, and surrounding prefectures.
  • B. 津山線
    津山線は岡山県の岡山駅と津山駅を結び、中国山地の田園風景の中を走るJR西日本の地方鉄道路線です。
  • C. JR石勝線
    JR石勝線は、北海道の南千歳駅から帯広方面へと至り、千歳市や夕張支線を含む石勝地域を結ぶJR北海道の幹線鉄道路線である。
  • D. JR片町線
    JR片町線(学研都市線)は、大阪府と京都府南部を結び、京橋駅から木津駅までを結ぶ西日本旅客鉄道(JR西日本)の都市近郊型鉄道路線である。
  • E. JR West Nara Line chosen
    The JR West Nara Line is a railway line in Japan operated by West Japan Railway Company that connects the Kyoto area with Nara, serving various cities and towns in between.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458d90c88190a58cead4e781ca6a completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f180d6841c81908df6d4e501860a15 completed April 29, 2026, 3:53 a.m.
Created at: April 17, 2026, 3:43 p.m.