Triple
T22919876
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Blue Fire Megacoaster |
E568831
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | launched steel roller coaster |
C4663
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: launched steel roller coaster Context triple: [Blue Fire Megacoaster, instanceOf, launched steel roller coaster]
-
A.
launched roller coaster
chosen
A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
-
B.
steel roller coaster
A steel roller coaster is a high-speed amusement ride featuring smooth, tubular steel tracks that enable complex inversions, steep drops, and precise, controlled maneuvers for riders.
-
C.
stand-up roller coaster
A stand-up roller coaster is a type of thrill ride where passengers remain standing in specially designed restraints as the train traverses a track with drops, turns, and inversions.
-
D.
Bolliger & Mabillard roller coaster
A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
-
E.
flying roller coaster
A flying roller coaster is a type of thrill ride where passengers are secured in a prone, face-down position beneath the track to simulate the sensation of free flight through the air.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458d90c88190a58cead4e781ca6a |
completed | April 17, 2026, 2:37 p.m. |
Created at: April 17, 2026, 3:42 p.m.