Triple

T22906045
Position Surface form Disambiguated ID Type / Status
Subject Newlands Reclamation Project E568445 entity
Predicate primaryCropRegion P150179 FINISHED
Object Truckee-Carson Irrigation District NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Truckee-Carson Irrigation District | Statement: [Newlands Reclamation Project, primaryCropRegion, Truckee-Carson Irrigation District]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Truckee-Carson Irrigation District
Context triple: [Newlands Reclamation Project, primaryCropRegion, Truckee-Carson Irrigation District]
  • A. Truckee-Carson Irrigation District chosen
    The Truckee-Carson Irrigation District is a water management agency in western Nevada that operates and maintains irrigation and drainage systems, primarily serving agricultural lands in the Truckee and Carson River basins.
  • B. Truckee Meadows Water Authority
    Truckee Meadows Water Authority is a public water utility that manages and delivers drinking water to the Truckee Meadows region around Reno, Nevada.
  • C. Imperial Irrigation District
    Imperial Irrigation District is a public utility agency in Southern California that manages water distribution and hydroelectric power, primarily serving agricultural and municipal users in the Imperial Valley.
  • D. Turlock Irrigation District
    Turlock Irrigation District is a California public irrigation and electric utility agency that supplies water for agriculture and power to communities in and around Turlock in the San Joaquin Valley.
  • E. Modesto Irrigation District
    Modesto Irrigation District is a California public agency that provides irrigation water and electric power services to agricultural and urban customers in and around the city of Modesto.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: primaryCropRegion
Context triple: [Newlands Reclamation Project, primaryCropRegion, Truckee-Carson Irrigation District]
  • A. majorCrop
    Indicates that a particular crop is one of the primary or most important crops cultivated in a given area or context.
  • B. locatedInAgriculturalRegion
    Indicates that an entity is situated within a region primarily characterized by agricultural activities or land use.
  • C. cultivatedPrimarilyIn
    Indicates that something is mainly grown, produced, or farmed in a particular place or environment.
  • D. widelyCultivatedIn
    Indicates that something is grown extensively or on a large scale within a particular place or region.
  • E. cultivatedInRegion
    Indicates that something (such as a crop or plant) is grown or produced through cultivation within a specified geographic region.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458cd9e48190943ad2e34485d939 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f1801a48948190b5f51f1d02351fc7 completed April 29, 2026, 3:50 a.m.
PD Predicate disambiguation batch_69ef3b6b2e2481908258156937b5a745 completed April 27, 2026, 10:33 a.m.
PDg Predicate description generation batch_69ef538a115081908982597f79355840 completed April 27, 2026, 12:16 p.m.
Created at: April 17, 2026, 3:41 p.m.