Triple

T22904075
Position Surface form Disambiguated ID Type / Status
Subject PM-3A nuclear reactor E568399 entity
Predicate instanceOf P0 FINISHED
Object military nuclear reactor C2095 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military nuclear reactor
Context triple: [PM-3A nuclear reactor, instanceOf, military nuclear reactor]
  • A. nuclear reactor
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • B. nuclear reactor project
    A nuclear reactor project is a coordinated engineering and management effort to design, license, construct, operate, and eventually decommission a nuclear reactor facility for energy production, research, or other specialized applications.
  • C. dual-purpose reactor
    A dual-purpose reactor is a nuclear reactor designed to simultaneously produce electrical power and another output, such as process heat or weapons-grade materials.
  • D. nuclear weapon
    A nuclear weapon is a highly destructive explosive device that releases immense energy through nuclear fission, fusion, or a combination of both, causing catastrophic blast, heat, and radiation effects.
  • E. plutonium production reactor chosen
    A plutonium production reactor is a nuclear reactor specifically designed and operated to irradiate uranium fuel and efficiently generate plutonium-239 for use in nuclear weapons or reactor fuel.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458cd9e48190943ad2e34485d939 completed April 17, 2026, 2:37 p.m.
Created at: April 17, 2026, 3:41 p.m.