Triple
T22886376
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Calgary +15 skywalk system |
E567614
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure in Calgary |
C3206
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure in Calgary Context triple: [Calgary +15 skywalk system, instanceOf, infrastructure in Calgary]
-
A.
infrastructure
chosen
Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
-
B.
bridge in Canada
A bridge in Canada is a structural crossing—such as a roadway, railway, or pedestrian span—located within Canadian territory that connects two points separated by physical obstacles like water, valleys, or other transportation routes.
-
C.
infrastructure facility
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
-
D.
University of Alberta facility
A University of Alberta facility is any physical or virtual space, building, or infrastructure owned, leased, or operated by the University of Alberta that supports its academic, research, administrative, or community activities.
-
E.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458a92ec81908fc1cd5f6407d2ab |
completed | April 17, 2026, 2:36 p.m. |
Created at: April 17, 2026, 3:40 p.m.