Triple

T22886374
Position Surface form Disambiguated ID Type / Status
Subject Calgary +15 skywalk system E567614 entity
Predicate instanceOf P0 FINISHED
Object pedestrian skywalk system C3675 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pedestrian skywalk system
Context triple: [Calgary +15 skywalk system, instanceOf, pedestrian skywalk system]
  • A. pedestrian skybridge
    A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
  • B. pedestrian bridge
    A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
  • C. pedestrian walkway
    A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
  • D. elevated walkway chosen
    An elevated walkway is a raised pedestrian pathway, typically supported above ground level, that allows people to move safely and efficiently over obstacles, traffic, or uneven terrain.
  • E. pedestrian access point
    A pedestrian access point is a designated location where people on foot can enter, exit, or cross into a specific area, pathway, or transportation facility.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458a92ec81908fc1cd5f6407d2ab completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 3:40 p.m.