Triple

T22879251
Position Surface form Disambiguated ID Type / Status
Subject Tiber embankment E567414 entity
Predicate instanceOf P0 FINISHED
Object river embankment C33744 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: river embankment
Context triple: [Tiber embankment, instanceOf, river embankment]
  • A. artificial embankment chosen
    An artificial embankment is a man-made raised structure of earth, rock, or other materials built to contain, redirect, or protect land and infrastructure from water or other environmental forces.
  • B. embankment dam
    An embankment dam is a large artificial barrier constructed from compacted earth or rock materials to hold back water and create a reservoir.
  • C. embankment section
    An embankment section is a cross-sectional representation of a raised earth or engineered structure built to support or protect infrastructure such as roads, railways, or flood defenses.
  • D. river weir
    A river weir is a low dam built across a river to raise the water level, regulate flow, and sometimes measure discharge or divert water.
  • E. river bank
    A river bank is the sloping land alongside a river that confines its water flow and shapes its course.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24589d8348190b96422d13a678bc1 completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 3:39 p.m.