Triple
T22860363
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kelani River |
E566900
|
entity |
| Predicate | hasHydropowerPlant |
P15311
|
FINISHED |
| Object | Canyon Hydropower Station |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Canyon Hydropower Station | Statement: [Kelani River, hasHydropowerPlant, Canyon Hydropower Station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Canyon Hydropower Station Context triple: [Kelani River, hasHydropowerPlant, Canyon Hydropower Station]
-
A.
Barron Gorge Hydroelectric Power Station
Barron Gorge Hydroelectric Power Station is a historic hydroelectric facility in Queensland, Australia, that harnesses the Barron River’s flow through Barron Gorge to generate renewable electricity.
-
B.
Jefferies Hydroelectric Station
Jefferies Hydroelectric Station is a hydroelectric power facility in South Carolina that generates electricity using water from Lake Moultrie as part of the Santee Cooper power system.
-
C.
Nunn hydroelectric plant
The Nunn hydroelectric plant is an early hydroelectric power station in Utah notable for pioneering long-distance high-voltage power transmission to support mining and regional development.
-
D.
Narrows Hydroelectric Plant
The Narrows Hydroelectric Plant is a hydroelectric power station that generates electricity using water impounded by Narrows Dam.
-
E.
Pullinque Hydroelectric Plant
Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Canyon Hydropower Station Target entity description: Canyon Hydropower Station is a hydroelectric power facility located on Sri Lanka’s Kelani River, contributing to the country’s renewable energy generation.
-
A.
Barron Gorge Hydroelectric Power Station
Barron Gorge Hydroelectric Power Station is a historic hydroelectric facility in Queensland, Australia, that harnesses the Barron River’s flow through Barron Gorge to generate renewable electricity.
-
B.
Jefferies Hydroelectric Station
Jefferies Hydroelectric Station is a hydroelectric power facility in South Carolina that generates electricity using water from Lake Moultrie as part of the Santee Cooper power system.
-
C.
Nunn hydroelectric plant
The Nunn hydroelectric plant is an early hydroelectric power station in Utah notable for pioneering long-distance high-voltage power transmission to support mining and regional development.
-
D.
Narrows Hydroelectric Plant
The Narrows Hydroelectric Plant is a hydroelectric power station that generates electricity using water impounded by Narrows Dam.
-
E.
Pullinque Hydroelectric Plant
Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24589083081908d5694c4fdc80086 |
completed | April 17, 2026, 2:36 p.m. |
| NER | Named-entity recognition | batch_69f17ec082c08190943e6cfc2e25c5cc |
completed | April 29, 2026, 3:45 a.m. |
Created at: April 17, 2026, 3:37 p.m.