Triple

T22854653
Position Surface form Disambiguated ID Type / Status
Subject American Centrifuge Plant (planned) E566446 entity
Predicate instanceOf P0 FINISHED
Object industrial facility project C14209 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: industrial facility project
Context triple: [American Centrifuge Plant (planned), instanceOf, industrial facility project]
  • A. industrial plant
    An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
  • B. industrial site chosen
    An industrial site is a designated area of land developed and equipped with infrastructure and facilities for manufacturing, processing, storage, or other large-scale industrial operations.
  • C. production facility
    A production facility is a physical site equipped with machinery, resources, and personnel dedicated to manufacturing goods or processing materials at scale.
  • D. petrochemical facility
    A petrochemical facility is an industrial complex where crude oil and natural gas are processed and chemically transformed into fuels, plastics, and other chemical products.
  • E. manufacturing plant
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458750b481908a8e4cf4609cc6cf completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 3:37 p.m.