Triple
T22854624
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | American Electric Power system |
E566445
|
entity |
| Predicate | reliabilityOrganization |
P102551
|
FINISHED |
| Object | North American Electric Reliability Corporation |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North American Electric Reliability Corporation | Statement: [American Electric Power system, reliabilityOrganization, North American Electric Reliability Corporation]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: North American Electric Reliability Corporation Context triple: [American Electric Power system, reliabilityOrganization, North American Electric Reliability Corporation]
-
A.
North American Electric Reliability Corporation
chosen
The North American Electric Reliability Corporation (NERC) is a nonprofit regulatory authority responsible for developing and enforcing reliability standards for the bulk power system across North America.
-
B.
Northeast Power Coordinating Council
The Northeast Power Coordinating Council is a regional reliability organization that oversees and promotes the reliable and secure operation of the bulk power system in the northeastern part of North America.
-
C.
Western Electricity Coordinating Council
The Western Electricity Coordinating Council is a regional reliability organization that oversees and coordinates the safe, reliable operation of the bulk electric power system across the Western Interconnection in North America.
-
D.
National Electric Power Regulatory Authority
The National Electric Power Regulatory Authority (NEPRA) is Pakistan’s federal agency responsible for regulating and overseeing the country’s electric power sector, including licensing, tariffs, and consumer protection.
-
E.
SERC Reliability Corporation
SERC Reliability Corporation is a regional organization responsible for overseeing and enforcing bulk power system reliability standards across parts of the southeastern and central United States under the North American Electric Reliability Corporation.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: reliabilityOrganization Context triple: [American Electric Power system, reliabilityOrganization, North American Electric Reliability Corporation]
-
A.
reliabilityCharacteristic
Indicates that one entity specifies or embodies a reliability-related property, feature, or performance attribute of another entity.
-
B.
reliabilityRecord
Indicates that there exists a record or documentation capturing the reliability characteristics, performance, or history associated with an entity or relationship.
-
C.
reliabilityMechanism
Indicates a mechanism or process that ensures the dependable, consistent, and correct functioning of a system or relationship.
-
D.
hasReliabilityStandards
chosen
Indicates that one entity defines, follows, or is governed by specific reliability standards established by another entity.
-
E.
refersToOrganizationRecognizedBy
Indicates that one entity makes reference to an organization that has been formally identified or acknowledged by a relevant authority or system.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458750b481908a8e4cf4609cc6cf |
completed | April 17, 2026, 2:36 p.m. |
| NER | Named-entity recognition | batch_69f17ebb4ea48190b4b865e316f6a75f |
completed | April 29, 2026, 3:44 a.m. |
| PD | Predicate disambiguation | batch_69eed2d507c08190895ed971af0fc755 |
completed | April 27, 2026, 3:07 a.m. |
Created at: April 17, 2026, 3:37 p.m.