Triple

T22819143
Position Surface form Disambiguated ID Type / Status
Subject ITU-T G.9807.1 E565180 entity
Predicate definesWavelengthPlan P149859 FINISHED
Object XGS-PON wavelength allocation LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: XGS-PON wavelength allocation | Statement: [ITU-T G.9807.1, definesWavelengthPlan, XGS-PON wavelength allocation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: definesWavelengthPlan
Context triple: [ITU-T G.9807.1, definesWavelengthPlan, XGS-PON wavelength allocation]
  • A. hasPlanningInstrument
    Indicates that an entity is associated with, or governed by, a specific planning instrument (such as a plan, policy, or regulatory document) that guides its development or management.
  • B. definesScheduleFor
    Indicates that one entity establishes or specifies the schedule according to which another entity operates or is organized.
  • C. platformPlanned
    Indicates that a platform is intended or scheduled to be created, implemented, or made available in the future.
  • D. overseesPlan
    Indicates that one entity is responsible for supervising, managing, or directing the development or execution of another entity’s plan.
  • E. developmentAuthorityPlan
    Indicates that an authority or governing body is responsible for creating, approving, or overseeing a specific development plan.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458426188190b58b8ab4844fe420 completed April 17, 2026, 2:36 p.m.
NER Named-entity recognition batch_69f17dce762c8190934fb921f942c9fd completed April 29, 2026, 3:41 a.m.
PD Predicate disambiguation batch_69eed2d117088190acbfe130d84f8627 completed April 27, 2026, 3:06 a.m.
PDg Predicate description generation batch_69eeeb577e2081909f4a4e9c296535c0 completed April 27, 2026, 4:51 a.m.
Created at: April 17, 2026, 3:33 p.m.