Triple

T22814141
Position Surface form Disambiguated ID Type / Status
Subject Pale Moon E565057 entity
Predicate instanceOf P0 FINISHED
Object Gecko-based browser C9360 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Gecko-based browser
Context triple: [Pale Moon, instanceOf, Gecko-based browser]
  • A. Mozilla project
    The Mozilla project is an open-source initiative focused on developing web technologies, applications, and standards that promote an open, accessible, and user-centric internet.
  • B. graphical web browser chosen
    A graphical web browser is an application that retrieves, interprets, and visually displays web content using a graphical user interface with elements like windows, tabs, images, and interactive controls.
  • C. web browser engine
    A web browser engine is the core software component that interprets HTML, CSS, JavaScript, and other web technologies to render and display web pages, manage layout, and handle user interactions.
  • D. experimental web browser
    An experimental web browser is a software application designed to explore and test novel web technologies, interfaces, and browsing paradigms that extend or challenge conventional browser behavior.
  • E. browser technology
    Browser technology encompasses the software, standards, and underlying mechanisms that enable users to access, interpret, and interact with content and applications on the World Wide Web.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458426188190b58b8ab4844fe420 completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 3:32 p.m.