Triple

T22813802
Position Surface form Disambiguated ID Type / Status
Subject SPS North Area E565049 entity
Predicate instanceOf P0 FINISHED
Object test-beam facility C39581 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: test-beam facility
Context triple: [SPS North Area, instanceOf, test-beam facility]
  • A. testing facility
    A testing facility is a specialized environment equipped with tools, equipment, and procedures designed to systematically evaluate, measure, and validate the performance, safety, or quality of products, systems, or processes.
  • B. particle beam test facility chosen
    A particle beam test facility is a specialized laboratory that generates and delivers controlled beams of particles (such as electrons, protons, or ions) for testing, calibrating, and characterizing detectors, materials, and accelerator components.
  • C. JAXA facility
    A JAXA facility is a physical site operated by the Japan Aerospace Exploration Agency that supports space-related research, development, testing, mission control, or public outreach activities.
  • D. weapons testing facility
    A weapons testing facility is a secure, controlled site where weapons and related systems are developed, evaluated, and tested for performance, safety, and reliability.
  • E. field tester
    A field tester is a professional who evaluates products, systems, or processes in real-world environments to verify performance, reliability, and suitability for intended use.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458426188190b58b8ab4844fe420 completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 3:32 p.m.