Triple

T22813503
Position Surface form Disambiguated ID Type / Status
Subject BaBar Collaboration E565041 entity
Predicate dataTakingStatus P53050 FINISHED
Object data taking completed LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: data taking completed | Statement: [BaBar Collaboration, dataTakingStatus, data taking completed]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: dataTakingStatus
Context triple: [BaBar Collaboration, dataTakingStatus, data taking completed]
  • A. dataTakingEndDate
    Indicates the date on which the process of collecting or taking data is completed or stops.
  • B. dataTakingPeriodNumber
    Indicates the specific sequential period or interval during which data is collected or recorded.
  • C. DACStatus
    Indicates the current state or condition of a digital-to-analog converter (DAC) in relation to its operation or performance.
  • D. collectingStatus chosen
    Indicates the current state or phase of an ongoing collection process or activity.
  • E. automationStatus
    Indicates whether a process, task, or system is being performed automatically or requires manual intervention.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458426188190b58b8ab4844fe420 completed April 17, 2026, 2:36 p.m.
NER Named-entity recognition batch_69f17d61c6f081908d3911710b3aff51 completed April 29, 2026, 3:39 a.m.
PD Predicate disambiguation batch_69eed2cb30f481909566369f515f6eff completed April 27, 2026, 3:06 a.m.
Created at: April 17, 2026, 3:32 p.m.