Triple
T22812326
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | South Twin River Road |
E564715
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | access route |
C3646
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: access route Context triple: [South Twin River Road, instanceOf, access route]
-
A.
access point
An access point is a networking device that allows wireless devices to connect to a wired network, typically providing Wi-Fi connectivity within a specific area.
-
B.
highway approach route
chosen
A highway approach route is a roadway segment or path that guides vehicles from local or arterial roads onto a highway, facilitating safe and efficient merging into higher-speed traffic.
-
C.
roadway approach
A roadway approach is the segment of a road leading up to an intersection, junction, or control device, where vehicles transition from through movement to potential stopping, turning, or yielding maneuvers.
-
D.
public transit route
A public transit route is a predefined path with designated stops and schedules along which public transportation vehicles (such as buses, trams, or trains) operate to move passengers between locations.
-
E.
gateway area
A gateway area is a transitional space that connects and regulates movement between distinct zones, often serving as an entry, control, or access point.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245823f4c8190ade442cdcc2c224a |
completed | April 17, 2026, 2:36 p.m. |
Created at: April 17, 2026, 3:32 p.m.