Triple
T22808586
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lansdowne Station (MBTA Commuter Rail) |
E564605
|
entity |
| Predicate | adjacentRailCorridor |
P57554
|
FINISHED |
| Object | Boston and Albany Railroad main line |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boston and Albany Railroad main line | Statement: [Lansdowne Station (MBTA Commuter Rail), adjacentRailCorridor, Boston and Albany Railroad main line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Boston and Albany Railroad main line Context triple: [Lansdowne Station (MBTA Commuter Rail), adjacentRailCorridor, Boston and Albany Railroad main line]
-
A.
Boston and Maine Railroad main line
The Boston and Maine Railroad main line was a major New England rail corridor that formed the core route of the Boston and Maine Railroad, connecting Boston with key cities and towns across northern Massachusetts and beyond.
-
B.
Boston and Albany Railroad
chosen
The Boston and Albany Railroad was a historic rail line that connected Boston, Massachusetts to Albany, New York, playing a major role in 19th- and early 20th-century transportation and commerce in the region.
-
C.
Boston and Albany Railroad Highland branch
The Boston and Albany Railroad Highland branch was a former suburban rail line in the Boston area that later became the right-of-way for the MBTA Green Line D branch light rail service.
-
D.
Boston–Albany rail corridor
The Boston–Albany rail corridor is a key east–west passenger and freight rail route linking Boston, Massachusetts with Albany, New York across the heart of New England.
-
E.
Boston–Concord main line
The Boston–Concord main line was a principal intercity rail corridor in New England that connected Boston, Massachusetts with Concord, New Hampshire, serving as a key route for the Boston and Maine Railroad.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: adjacentRailCorridor Context triple: [Lansdowne Station (MBTA Commuter Rail), adjacentRailCorridor, Boston and Albany Railroad main line]
-
A.
adjacentToStation
Indicates that one entity is located next to or immediately beside a station.
-
B.
partOfRailwayCorridor
chosen
Indicates that one entity is a segment, component, or area belonging to or contained within a specific railway corridor.
-
C.
railCorridorType
Indicates the specific classification or type of a rail corridor associated with the subject (e.g., mainline, branch line, high-speed, freight, etc.).
-
D.
adjacentStationOnLine
Indicates that one station is directly next to another station along the same transit line, with no other station in between.
-
E.
adjacentStationOnDistrictLine
Indicates that one station is directly next to another station along the District Line, with no other stations in between on that line.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245823f4c8190ade442cdcc2c224a |
completed | April 17, 2026, 2:36 p.m. |
| NER | Named-entity recognition | batch_69f17d5e0b088190ad0b9cc0d5aa1d96 |
completed | April 29, 2026, 3:39 a.m. |
| PD | Predicate disambiguation | batch_69eed2cb30f481909566369f515f6eff |
completed | April 27, 2026, 3:06 a.m. |
Created at: April 17, 2026, 3:32 p.m.