Triple

T22807976
Position Surface form Disambiguated ID Type / Status
Subject Chișinău railway station E564590 entity
Predicate partOf P40 FINISHED
Object Moldovan railway network NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Moldovan railway network | Statement: [Chișinău railway station, partOf, Moldovan railway network]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Moldovan railway network
Context triple: [Chișinău railway station, partOf, Moldovan railway network]
  • A. Calea Ferată din Moldova chosen
    Calea Ferată din Moldova is the state-owned national railway company of Moldova, responsible for operating the country’s rail transport network.
  • B. Romanian railway network
    The Romanian railway network is the national system of rail lines and infrastructure in Romania, connecting major cities, industrial centers, and international routes across the country.
  • C. Bucharest–Brașov railway
    The Bucharest–Brașov railway is a major Romanian rail corridor linking the capital Bucharest with the mountain city of Brașov through the scenic Prahova Valley.
  • D. railway line Suceava–Câmpulung Moldovenesc
    The railway line Suceava–Câmpulung Moldovenesc is a regional rail route in northeastern Romania that connects the city of Suceava with the town of Câmpulung Moldovenesc through the historical region of Bukovina.
  • E. Bucharest–Timișoara railway line
    The Bucharest–Timișoara railway line is a major Romanian rail corridor linking the capital Bucharest with the western city of Timișoara and passing through several counties, including Mehedinți.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245823f4c8190ade442cdcc2c224a completed April 17, 2026, 2:36 p.m.
NER Named-entity recognition batch_69f17d5e0b088190ad0b9cc0d5aa1d96 completed April 29, 2026, 3:39 a.m.
Created at: April 17, 2026, 3:32 p.m.