Triple

T22807289
Position Surface form Disambiguated ID Type / Status
Subject High Desert region of San Bernardino County E564570 entity
Predicate waterImportedFrom P11260 FINISHED
Object State Water Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Water Project | Statement: [High Desert region of San Bernardino County, waterImportedFrom, State Water Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: State Water Project
Context triple: [High Desert region of San Bernardino County, waterImportedFrom, State Water Project]
  • A. State Water Project chosen
    The State Water Project is a massive California water storage and delivery system that transports water from northern sources to agricultural, urban, and industrial users across the state, including the Central Valley.
  • B. Central Valley Project
    The Central Valley Project is a large-scale federal water management system in California that stores and delivers water for agriculture, cities, and environmental uses across the Central Valley.
  • C. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • D. Truckee-Carson Project
    The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
  • E. Feather River Project
    The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: waterImportedFrom
Context triple: [High Desert region of San Bernardino County, waterImportedFrom, State Water Project]
  • A. importedCommodity
    Indicates that a commodity has been brought into a country or region from abroad through import activities.
  • B. imported chosen
    Indicates that something was brought into a country, system, or context from an external source.
  • C. importedWith
    Indicates that one entity was brought into a system, context, or location together with or as part of another entity during an import process.
  • D. isOilImporter
    Indicates that an entity imports oil from other sources or countries.
  • E. countryOfExport
    Indicates that one entity is the country from which another entity (such as a product, shipment, or service) is exported.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245823f4c8190ade442cdcc2c224a completed April 17, 2026, 2:36 p.m.
NER Named-entity recognition batch_69f17d5d41dc819081912d9e29828bfb completed April 29, 2026, 3:39 a.m.
PD Predicate disambiguation batch_69eed2cb30f481909566369f515f6eff completed April 27, 2026, 3:06 a.m.
Created at: April 17, 2026, 3:32 p.m.