Triple

T22792311
Position Surface form Disambiguated ID Type / Status
Subject whitewashed village of Binibeca Vell E564143 entity
Predicate instanceOf P0 FINISHED
Object purpose-built village C11054 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: purpose-built village
Context triple: [whitewashed village of Binibeca Vell, instanceOf, purpose-built village]
  • A. tourist village chosen
    A tourist village is a small, purposefully developed settlement or area designed to accommodate and entertain visitors with lodging, amenities, and local cultural or recreational attractions.
  • B. Native village
    A native village is a small, traditionally organized settlement inhabited primarily by an indigenous community, reflecting its cultural, social, and economic practices.
  • C. village-like settlement
    A village-like settlement is a small, closely-knit residential community with limited infrastructure, where inhabitants live in close proximity and often share local resources, traditions, and social ties.
  • D. model village
    A model village is a small-scale, detailed physical representation of a village, often created for display, educational, or planning purposes.
  • E. village complex
    A village complex is a clustered arrangement of residential, communal, and support structures that together form the functional and social core of a small rural settlement.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458185f88190b0045227ee420411 completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 3:30 p.m.